国产人妻人伦精品熟女-清冷校草受灌满哭求饶BL-国色精品卡一卡2卡3卡4卡免费-人禽乱H交H高文-久久久free性zozo交体内谢-国产精品扒开腿做爽爽爽视频-国产精品福利小视频-精品国产美女福利到在线不卡-岛国AV无码在线-亚洲AV日韩精品久久久久

當前位置: 首頁 - 新聞資訊 > 公司動態

安裝通風管道前的6個準備工作

來源:http://m.xyphw.com 日期:2021-06-29 發布人:admin

通風管道在現代建筑中必不可少,它的的作用也是非常強大,山東通風管道廠家提醒大家安裝通風管道前要做好6個準備工作:
Ventilation duct is indispensable in modern architecture, and its role is also very powerful. Shandong ventilation duct manufacturers remind you to make six preparations before installing ventilation ducts
1、根據所需安裝通風管道的場所結構及環境,進行通風管道設計,確保通風管道的實用性。
1. According to the structure and environment of the place where the ventilation pipe needs to be installed, the ventilation pipe is designed to ensure the practicability of the ventilation pipe.
2、一般送排風系統和空調系統的通風管道安裝,需在建筑物的屋面做完,安裝部位的障礙物已涪理干凈的條件下進行。
2. In general, the installation of ventilation pipes for air supply and exhaust system and air conditioning system should be carried out under the condition that the roof of the building is finished and the obstacles at the installation position have been cleared.
3、一般除塵系統通風管道安裝,需在廠房內與風管有關的工藝設備安裝完畢,設備的接管或吸、排塵罩位置已定的條件下進行。
3. Generally, the installation of the ventilation pipe of the dust removal system should be carried out after the installation of the process equipment related to the air pipe in the plant and the position of the equipment connecting pipe or dust suction and discharge hood has been determined.
4、施工準備工作已做好,如施工工具、吊裝機械設備、必要的腳手架或升降安裝平臺已齊備施工用科已能滿足要求。
4. The construction preparation work has been done well, such as construction tools, hoisting machinery and equipment, necessary scaffolding or lifting installation platform are complete, and the construction department can meet the requirements.
5、要與土建施工密切配合,應預圖的安裝孔洞,預埋的支架構件均已完好,并經檢查符合設計要求。
5. To closely cooperate with the civil construction, the installation holes in the drawing and the embedded support components are in good condition and meet the design requirements after inspection.
6,通風及空調系統管路組成的各種通風管道、部件、配件均已加工完畢,并經質量檢查合格。
6. All kinds of ventilation pipes, components and accessories composed of ventilation and air conditioning system pipes have been processed and passed the quality inspection.
通風管道只有在安裝前做好準備才能保證后期安裝順利,也減少后期通風管道使用過程中問題的發生
Only when the ventilation pipe is well prepared before installation, can it be installed smoothly in the later stage and reduce the occurrence of problems in the use of the ventilation pipe in the later stage通風管道在現代建筑中必不可少,它的的作用也是非常強大,山東通風管道廠家提醒大家安裝通風管道前要做好6個準備工作:
Ventilation duct is indispensable in modern architecture, and its role is also very powerful. Shandong ventilation duct manufacturers remind you to make six preparations before installing ventilation ducts
1、根據所需安裝通風管道的場所結構及環境,進行通風管道設計,確保通風管道的實用性。
1. According to the structure and environment of the place where the ventilation pipe needs to be installed, the ventilation pipe is designed to ensure the practicability of the ventilation pipe.
2、一般送排風系統和空調系統的通風管道安裝,需在建筑物的屋面做完,安裝部位的障礙物已涪理干凈的條件下進行。
2. In general, the installation of ventilation pipes for air supply and exhaust system and air conditioning system should be carried out under the condition that the roof of the building is finished and the obstacles at the installation position have been cleared.
3、一般除塵系統通風管道安裝,需在廠房內與風管有關的工藝設備安裝完畢,設備的接管或吸、排塵罩位置已定的條件下進行。
3. Generally, the installation of the ventilation pipe of the dust removal system should be carried out after the installation of the process equipment related to the air pipe in the plant and the position of the equipment connecting pipe or dust suction and discharge hood has been determined.
4、施工準備工作已做好,如施工工具、吊裝機械設備、必要的腳手架或升降安裝平臺已齊備施工用科已能滿足要求。
4. The construction preparation work has been done well, such as construction tools, hoisting machinery and equipment, necessary scaffolding or lifting installation platform are complete, and the construction department can meet the requirements.
5、要與土建施工密切配合,應預圖的安裝孔洞,預埋的支架構件均已完好,并經檢查符合設計要求。
5. To closely cooperate with the civil construction, the installation holes in the drawing and the embedded support components are in good condition and meet the design requirements after inspection.
6,通風及空調系統管路組成的各種通風管道、部件、配件均已加工完畢,并經質量檢查合格。
6. All kinds of ventilation pipes, components and accessories composed of ventilation and air conditioning system pipes have been processed and passed the quality inspection.
通風管道只有在安裝前做好準備才能保證后期安裝順利,也減少后期通風管道使用過程中問題的發生
Only when the ventilation pipe is well prepared before installation, can it be installed smoothly in the later stage and reduce the occurrence of problems in the use of the ventilation pipe in the later stage
上一篇:通風管道對于我們生活起到什么樣作用?
下一篇:濟南通風管道安裝都包括哪些步驟?

推薦產品

  • 廚房排煙
  • 廚房排煙
  • 軸流風機
  • 不銹鋼制品

本站圖片均由網站所有方提供,部分圖片來源于網絡,如有任何疑問請及時與我們聯系,未經溝通本站不承擔相關法律責任!

国产又黄又硬又粗| 少妇人妻无码专区免费视频| 日韩AV第一页| 无码人妻精品一区二区三| 亚洲亚中文久久精品无码丁香| 久久久成人精品一区二区三区| 国产护士HD高潮护士| 国产成人精品亚洲777人妖| 成av人片一区二区三区久久| 中文字幕一区二区久久人妻网站| 国产精品18久久久久久首页狼| 国产性爱无码| 精品国产乱码久久久| 久久精品视频一区二区三区| 国产无码影视| 中文字幕69| 大香蕉论坛| 国产XXX村妇混乱7777| 五月天中文字幕| 国产做a爱一级毛片久久| 亚洲无码在线观看| 九九黄色| 亚洲精品在线观看视频| 亚洲三级视频在线观看| 拍国产真实乱人偷精品| 性少妇mdms丰满hdfilm| 一性一交一口添一摸视频| 欧美高清一区二区| 少妇被躁爽到高潮| 人人妻碰碰碰免费av视频| 亚洲视频在线观看| 国产精品三级久久久久久电影 | 丁香婷婷五月| 日日夜夜爽| 佐山爱在线播放| 亚洲国产精品麻豆| 中文字幕无码在线视频| 精品人妻一区二区| 午夜亚洲AV永久无码精品蜜芽 | 91在线无码精品秘 co| 久久久久国产精品一区|